FacebookTwitter

Bid/RFP/RFQ LISTINGS

RFQ/RFP# Title of RFQ/RFP RFQ/RFP Closing Date Award Date
08-1718

VOIP Phone Solution

Addendum No. 1     09/21/18

Addendum No. 2     09/25/18

Addendum No. 3     10/10/18

10/17/18  
01-1819

Pay and Classification Study

Addendum No.1     11/26/18

12/12/18 02/04/19
02-1819 Special Events Production Services 12/12/18 02/04/19
03-1819 Insurance Consultant Services 01/30/19 04/01/19
04-1819

Current Transformer Testing Services

Addendum No. 1     03/26/19

04/03/19  
05-1819

Various Property & Casualty Insurance Coverages

Addendum No. 1     07/03/19

Addendum No. 2     07/17/19

07/24/19 09/16/19
06-1819

Inspection Services

Addendum No. 1     06/20/19

Addendum No. 2     06/26/19

Addendum No. 3     07/03/19

07/17/19 08/19/19
07-1819

Groundskeeping Materials - Fertilizer, Pesticide, Herbicide, Grass Seed and Related Items

07/10/19 08/05/19
08-1819

Design-build Contract for Sampson Substation Autotransformer No. 2 Replacement 2019

Addendum No. 1     08/23/19

Addendum No. 2     08/30/19

Addendum No. 3     08/30/19 (Rev. 09/05/19)

Addendum No. 4     09/05/19

09/18/19  
BID# Title of Bid Bid Closing Date Award Date
1819-01

230/138 kV, 150/200/250 MVA, Autotransformer

Addendum No. 1     10/26/18

Addendum No. 2     11/21/18

12/05/18 01/22/19
1819-02

Installation of Underground Infrastructure

Addendum No. 1     12/10/18

Cancelled Cancelled
1819-03

Pad Mount Switchgear Type 12 and Single Phase Pad Mount VFI Switchgear

Addendum No. 1     12/10/18

Addendum No. 2     01/14/19

01/23/19 03/18/19
1819-04

Installation of Underground Infrastructure - Rebid

Addendum No. 1     01/29/19

02/06/19 03/04/19
1819-05

Tree Trimming and Vegetation Management

Addendum No. 1     01/29/19

Addendum No. 2     02/04/19

02/13/19 03/18/19
1819-06

Stormwater Channel Improvements (J.Turner Butler Blvd. to Marsh Landing Prkwy.)

     Specifications

     Drawings (1-25)

     Drawings (26-36)

     Drawings (37-46)

     Addendum No. 1     07/03/19

07/10/19 09/16/19
1819-07 Group Operated Air Break Switches 04/03/19 05/06/19
1819-08 Fire Station #1 Rollup Door Replacement 03/27/19 05/06/19
1819-09 O&M Replacement Flooring 03/27/19 05/06/19
1819-10

Liquid Chlorine and Sulfur Dioxide

Addendum No. 1     03/19/19

04/10/19 06/17/19
1819-11

PCP Switchboard Replacement

Addendum No. 1     03/26/19

Addendum No. 2     04/03/19

Addendum No. 3     04/09/19

Addnedum No. 4     04/10/19

Addendum No. 5     04/24/19

05/01/19 05/20/19
1819-12 Miscellaneous Water Main Replacement at Various Locations - Phase F 04/10/19 05/06/19
1819-13

General Contract for Modifications to Butler Substation

Specifications

Drawings Pt 1 (Pages 1-47)

Drawings Pt 1 (Pages 48-94)

Drawings Pt 2 (Pages 1-65)

Drawings Pt 2 (Pages 66-96)

Addendum No. 1     04/24/19

05/01/19

 

06/17/19

1819-14 Distribution Transformer - 1500 kVA, 120/208Y volt Cancelled Cancelled
1819-15

Offsite 12” Well Header for WTP 1, Well No.16 & 6” WM Replacement

07/31/19 09/16/19
1819-16 Landscape Maintenance 08/07/19 09/16/19
1819-17

4th Street South Stormwater Improvements

Specifications

Drawings

07/31/19 09/16/19
1819-18 Distribution Transformer - 1500 kVA, 120/208Y volt - Re-bid 08/14/19 09/16/19

Bid/RFP/RFQ award based on Department Analysis and Council Approval

A written notice of intent to file a protest must be filed with the Purchasing Administrator within three (3) business days after receipt by the bidder or proposer of the Bid or RFP Award Notice from the Purchasing Administrator in accordance with the procedures set forth in Section XII K., City of Jacksonville Beach Purchasing Manual.  Request further bid listing information.
 

 

 

Search form